Hello All,
Today we went straight to work. The programmers worked on the PID for the shooter; the field guys tested throwing the ball across the field, and in the shop we got the conveyor assembly for the practice robot riveted. We have a fiberglass panel that still needs to be replaced in the competition robot conveyor assembly because we changed it out to put it in the practice robot since there was an error with it. There is going to be lots of drilling through rivets as we get more parts since we are assembling with what we have, often times making a note of the component we are missing and continuing on with the assembly. This way we can work even before we have everything.
As far as the drive base goes, the practice and competition drive bases are in slightly different stages. The drive bases are basically the following:
- 8-wheel drive
- Front pair (of wheels) 1 sprocket
- Second pair 2 sprockets
- Third pair 2 sprockets with an extra 1 large sprocket
- Back pair 1 sprocket
With this pattern we finished the drive base for the practice robot, which was great because we were planning on testing driving around with it soon. However, it turns out we do not have another pair of large sprockets yet and that the new ones we ordered are not going to be as good as the ones we already put in the practice robot… So, tomorrow we are going to swap the third pair of wheels between the practice and competition robot and just wait until the other sprockets come for the practice robot drive base to be complete.
Well, that’s it for today, follow the smell tomorrow!
Camila


